PIPELINES RIVER CROSSINGS:

Project Description

Year

Country

Client

 

Construction of 3 River Crossings of 22” Pipeline of 5.4 Km total.

- Al Furat River (4.5 Km)

- Al Khabour River (0.6 Km)

- Orontes River (0.3 Km)

2003 – 2004

Syria

SCOTRACO Co

Integrated Gas Project.

- Al Furat River Crossing (2.6Km)

2000-2001

Syria

CONOCO

Construction GIDO gathering station expansion

- Al Furat River Crossing

1994-1995

Syria

AFPC (Shell)

     
   
Sonar inspection of the trench Start of Pulling 22" P/L - SCOTRACO
     
     
 
River Crossing Operation - SCOTRACO   End of Pulling 22" P/L - SCOTRACO

 