Project Description |
Year |
Country |
Client |
| |
RAKGAS Pipeline to RAK Ceramic
- 30 Km of 12” Export P/L. |
2005 – Now |
UAE |
RAKGAS |
Potable Water Distribution Project – Arzew |
2004-Now |
Algeria |
Bentini |
Melut Basin Oil Development Project, Export Pipeline 32” – Segment A2.
Construction and Commissioning of 187 Km – 32” P/L. |
2004-Now |
Sudan |
Petrodar |
Integrated Gas Project.
- Construction of 250 Km of 18 " Export Gas P/L.
- 100 Km of Flow Lines (from 8" to 26"). |
2000-2001 |
Syria |
CONOCO |
Well Head Connections:
- Construction of Oil Flow Lines including their connection to the well-heads and inlet manifolds. |
1996- 2003 |
Syria |
DEZPC |
Construction JIDO Gathering Station Expansion, the work includes:
-15 Km 8" pipeline with HDPE lined.
- 8 Km F/L. |
1994-1995 |
Syria |
AFPC
(Shell-SPC) |
Construction of Oil Production Facility at AL-QAHAR (DEZ) the work includes the construction of:
- 40 Km 10” P/L.
- 27 Km 6” and 4” F/L. |
1993-1994 |
Syria |
DEZPC |
Construction of Oil Production Facility
Which included:
- 11 Km 4.5” Shipping P/L to Thayyem.
- 2 Km F/L. |
1991-1992 |
Syria |
AFPC |
Construction of North Attala Early Production Facilities (EPF), including:
- 16 Km P/L Separating Stations. |
1990 |
Syria |
ELF-Aquitaine - Syrie |
Construction of 400 Km Gas P/L. |
1985-1989 |
Syria |
MONTAGI |
Construction of various Flow Lines. |
1983 |
Syria |
PECTEN |